Case Study · Hotel & contract

Hotel Bathroom LED Mirror Programme

A single specification of front-lit LED mirrors rolled out across guest bathrooms, shipped in phased batches to match the fit-out programme.

Middle East

Project region

360 pcs across 4 models

Total quantity

35 days

Signed to delivered

2

Products supplied

Guest bathrooms were specified around one mirror family so that maintenance, spare glass and driver replacement stay interchangeable across floors. Three-CCT switching was locked to a single factory setting before production so every room reads the same on handover.

Each unit shipped with the heated demister pad bonded at the factory, hard-wired at 100-240V and IP44 rated, which kept the electrical scope on site to a single connection per mirror.

Delivery was split into phased batches against the fit-out programme rather than one bulk drop, so the site never held more boxes than the floors being finished that month.

Products Used In This Project

More Delivered Projects

Have a project with a hard opening date?

Send the spec sheet — we answer with pricing and a locked timeline in 24 hours.

Get a Quote
Get a Quote